Endeavour and Trevi Systems plan to use recovered AI data center heat for forward-osmosis desalination. Explore the proposed water yields, how the technology works, and what must be proven.
Enel has added seven operating solar plants across Virginia and the Carolinas. Explore the $140 million deal, 270 MWdc capacity, and what the numbers mean.
Westinghouse is expanding nuclear fuel manufacturing in South Carolina with a $1 billion LEU+ project targeted for 2030. Here’s how the technology works.
MISO selected three developers for a $1.23 billion Iowa transmission project. Explore the proposed 765-kV backbone, substations, and 2032–2034 milestones.
Soluna and Applied Digital have agreed to plan a 50 MW AI data center beside a Texas wind farm. Learn how the venture, power supply and proposed lease would work.
Explore Olenox’s three-phase proposal to expand from 9,700 to 20,000 Bitcoin miners using self-generated natural-gas power. Learn what the proposed 1.5¢/kWh rate and 75 MW capacity really mean.
Google and Voltus are planning gigawatt-scale flexible power capacity across PJM. Learn how batteries, smart thermostats and industrial demand response can support the grid.
Emerald AI, NVIDIA and Nscale report a 25% AI server-rack power reduction during a 30-minute Iceland test. Here’s what the result shows about flexible data-center loads—and what it does not.
Microsoft withdrew from Nscale’s planned 50 MW Essex AI data center after grid delays stretched toward the 2030s. Explore the 23,040-GPU plan, Bitcoin mining connections, and what power access means for AI.
The October 2026 PJM grid emergency highlights a capability Bitcoin miners already use at scale: rapidly curtailing power demand when the grid is stressed.