Hyperscale Data reports $50.6 million in Bitcoin, cash and restricted cash as its Michigan AI data center targets an initial 10 MW energization in December.
Alpha Compute disclosed a $71.9 million contract for a planned 576-GPU NVIDIA B300 AI cluster in Sweden. The company says its power is 100% hydropower; here is what the SEC filing does and does not establish.
OpenAI’s new Grid Protectors Program starts with a planned Georgia AI campus contracted for 3.2 GW and up to 1 GW in demand response. What is committed—and what remains untested?
Hitachi Energy’s new NVIDIA Omniverse-based power simulation models 800 VDC AI data-center infrastructure, grid resilience and changing electrical loads before construction.
Aligned Data Centers and Munters introduce Delta Cube 3.0, claiming 10% higher air-cooling capacity and 10% greater cooling efficiency in the same footprint.
CXL 4.0 doubles nominal link transfers to 128 GT/s, but AI servers still face shared-memory latency and congestion. Here is how memory pooling works and why it matters.
Z Squared begins engineering its El Dorado, Arkansas data center, with 8 MW of existing utility service and a 150 MW expansion goal not yet contracted or delivered.
Ceva unveiled four next-generation NeuPro NPU IP tiers for sensors, robots and data centers, claiming up to 2× higher throughput per chip area and 50% better energy efficiency.
BrainChip brings its AKD1500 neuromorphic processor to Raspberry Pi 5, promising event-based AI and local on-chip learning; independent efficiency benchmarks remain needed.