Keel Infrastructure sells 2,520 BTC for $192.2 million as quarterly mining production falls 50.2% and revenue drops 59.4% amid its AI data-center transition.
PowerX and Energy Vault signed a non-binding agreement to explore up to 1.5 GWh of battery storage supply for U.S. deployment in 2027, with no firm orders announced.
Keel, formerly Bitfarms, sold 2,520 BTC for $192.2M during Q3 2026 and now sells new Québec production daily. Mining revenue fell 59%; AI revenue remains ahead.
OSDCEC.016 teaches data center engineers how to interpret voltage sags, current THD, TDD, UPS operating modes and power quality event records through verified manufacturer training and independently checked calculations.
Google takes over Crusoe’s Wyoming data-center site. The asset-sale price remains undisclosed; Google’s $17 billion project plan includes 702 MW of proposed fuel cells.
Panthalassa opens a Vancouver, Washington factory to build ocean-wave-powered AI nodes. The startup’s Ocean-3 plan follows an earlier Pacific prototype, with commercial performance still unproven.
NTT DATA signs for 900 MW of Bloom Energy fuel-cell power across global data centers, with first equipment shipments expected in 2027. Technical and emissions analysis.
Google, Microsoft, Meta and NVIDIA’s OCP grid-interface specification sets voltage ride-through and recovery benchmarks for AI computing loads. Technical analysis and conference videos.
Willdan reports limited engineering and procurement authorizations for 643 MW of substation and battery projects in California, Texas and Illinois. The projects are not yet confirmed operational.
At Baron Capital’s November 6 conference, Elon Musk predicts first StarMind orbital AI launches in Q3 2027 and SpaceX annualized revenue above $500 billion by December 2027.
Alphabet’s new Form 13F shows 2.98 million Qualcomm shares worth $547.9 million as Qualcomm moves into AI data center processors. What the filing does and does not prove.