NTT DATA signs for 900 MW of Bloom Energy fuel-cell power across global data centers, with first equipment shipments expected in 2027. Technical and emissions analysis.
Google, Microsoft, Meta and NVIDIA’s OCP grid-interface specification sets voltage ride-through and recovery benchmarks for AI computing loads. Technical analysis and conference videos.
Willdan reports limited engineering and procurement authorizations for 643 MW of substation and battery projects in California, Texas and Illinois. The projects are not yet confirmed operational.
ERCOT’s November 6 workshop examines how qualifying Bitcoin mines and other large Texas electricity users may be directed to reduce demand during grid emergencies.
NVIDIA, QCT and LITEON explain sidecar, end-of-row and greenfield 800 VDC strategies as rack power approaches 1 MW, with retrofit and safety constraints.
AEP selects Jacobs and WSP to help execute its $37 billion grid transmission investment across 11 states, with extra-high-voltage projects and permitting ahead.
Vertiv signs a three-year Infineon silicon and silicon-carbide semiconductor supply agreement to support 800 V DC AI power systems. Financial terms and volumes remain undisclosed.
Envision says its integrated 800V DC electrical system now powers live AI workloads in China. The operating scale is undisclosed; the 3GW campus remains a future target.
Potomac Edison filed a Virginia application for nearly 29 miles of transmission upgrades. The Gore–Doubs–Goose Creek project proposes 500-kV circuits, with construction planned for 2028.